Questions? Feedback? powered by Olark live chat software

HUD 221(d)(4) 
The ground-up development loan of your dreams

The FHA 221(d)(4) loan guaranteed by HUD is the multifamily industry’s highest leverage, lowest cost, non recourse, fixed rate loan available in the business. 221(d)(4) loans are fixed and fully amortizing for 40 years, which doesn’t include the, up to, 3 years, interest only fixed rate during the construction period (so the loan is up to 43 years fixed and fully amortizing for 40). HUD loans, unlike most bank loans, are absolutely asset based, meaning that HUD scrutinizes the property location, the pro forma rents and expenses, and of course the development team to ensure it successfully comes out of the ground. HUD 221(d)(4) loans are more costly to originate and take longer to close than traditional loans, but if working with an experienced intermediary, the costs and timing to originate an FHA 221(d)(4) insured loan are far outweighed by the benefits in the form of leverage, interest rate risk mitigation, recourse and more.

Overview of Terms, Qualification, and Valuable Facts

Facts to Consider

HUD provides a full checklist of requirements, however much of the checklist and process is managed in-house. Here you can see the full HUD 221(d)(4) checklist. Below, however, is a fairly complete synopsis of the outline of the 221(d)(4) FHA insured loan program. You can find the basics to submit a file for consideration at the Apply Page on our site. 

  • 40 year fixed and fully amortizing interest rates as of January, 2016 are ranging between 4.10% and 4.75% which includes MIP. 221(d)(4) loans are interest only during the construction period which provides for, up to an additional three years of financing at the same fixed rate.
  • All loans must go through a HUD pre-review process.
  • Adherence to David Bacon prevailing wage standards is required.
  • An annual audit of operations is required.
  • Hard second liens are not allowed but soft seconds and stock pledges are allowed if structured in accordance with HUD requirements.
  • A bonded general contractor is required.
  • The minimum loan amount is $2,000,000; exceptions are made on a case-by-case basis. Generally speaking, most 221(d)(4) construction loans are $15,000,000 and above. There is no maximum loan amount. 

Eligible Properties   

The construction or substantial rehabilitation of detached, semi-detached, row, walkup, and elevator-type multifamily properties including market rate, low-to-moderate income and subsidized multifamily, cooperative housing and affordable housing properties with at least 5 units. 

commercial space limitation 

Commercial and retail space is limited to the lesser of 10% of the gross floor area or 15% of gross income. 

ELIGIBLE Borrowers 

Single asset, bankruptcy remote, for profit or non-profit entities.

Use of Proceeds (substantial rehabilitation only) 

To qualify as a substantial rehabilitation of a multifamily property, a property must meet one of the following requirements; (a) the cost of repairs, replacements, and improvements to the existing property must exceed the greater of 15% of the replacement cost of the property after completion of all work or $6,500 per unit adjusted by the local HUD office for high cost percentage in that area, or; (b) The replacement of two or more buildings regardless of the cost.

loan amount/Leverage/Dscr

The loan amount will be maximum proceeds subject to the lesser of:

  • 83.3% LTC (or replacement cost), 83.3% of net operating income or, 1.20 DSCR for Market Rate Properties.
  • 87% LTC (or replacement cost), 87% of net operating income or, 1.15 DSCR for Affordable Housing Properties.
  • 90% LTC (or replacement cost), 90% of net operating income or, 1.11 DSCR for Rental Assistance Properties. 

Escrows

  • Replacement reserves are required in accordance with HUD guidelines.
  • Taxes and insurance escrowed monthly (post-construction).
  • Working capital reserve account equal to 4% of the loan amount (paid in cash or LOC, which is a letter of credit); with unused amount refunded, as per "additional items" below.
  • Operating deficit reserve equal to at least 3% of the loan amount; unused amount later refunded as per "additional items" below.

Mortgage Insurance Premium 

A mortgage insurance premium is paid annually (in the above example of a rate between 4.10% and 4.75%, those interest rates already include the estimated HUD required MIP). The MIP is payable at closing for each year of construction and then annually thereafter. The mortgage insurance premium is 65 basis points for market rate properties, 45 basis points for section 8 or new money LIHTC properties, and 70 basis points for section 220 urban renewal projects that are not Section 8 or LIHTC.

Term & Amortization

Fixed and interest only for up to 36 months during construction followed by an additional 40 of fully amortizing, fixed rate payments. A maximum term of 43 years including construction period.

Interest Rate

Interest rates are fixed throughout the life of the loan (both construction and permanent stages) and determined at commitment by prevailing market conditions. As of January 2016, interest rates on HUD 221(d)(4) loans are generally ranging from 3.10% to 4.10% before accounting for the required MIP adjustment. 30 to 180 day rate lock commitments are available. An early rate lock feature is available allowing the borrower to lock the rate after preliminary underwriting. There is a 1% rate lock deposit payable at time of rate lock and refunded at closing. 

Recourse

All loans are non-recourse to key principals both during construction and permanent financing subject to standard carve-outs.

Assumability

All loans are fully assumable subject to FHA approval and a fee of 0.05% of the original FHA insured loan amount. 

Prepayment

Generally, for best pricing, 10 years of call protection with a 2 year lockout, followed by a step down from 8%. There is no prepayment penalty if the loan is assumed. 

Replacement Reserves

Annual deposits are required for replacement reserves equal to the greater of (a) 0.60% of total cost for new construction or 0.40% of the loan amount for substantial rehabilitation projects or; (b) $250 per unit per year. In certain circumstances HUD may consider waivers if calculations exceed $500 per door. 

Application

Market rate property applications follow a two step process; first the pre-application then the firm application. Affordable and Rental Assisted properties may use MAP one-stage processing.

synopsis of costs

  • Application Fee: Usually $25,000 to cover lender due diligence and 3rd party reports including:
    • Appraisal
    • Phase 1 environmental
    • Construction cost review
    • Market study
    • Plans and specs review
  • FHA exam fee: 0.30% payed as 0.15% at pre-application and 0.15% at application.
  • FHA inspection fee: 0.50% payed from mortgage proceeds.
  • Financing and placement fees: Typically capped at 3.50% of the loan amount paid at closing from mortgage proceeds.
  • Good faith deposit (rate lock and commitment): Between 0.50% and 1% of loan amount paid at time of commitment and refunded at closing. 
  • Lender's legal, title, and other standard borrower closing costs.

Timing

One-stage applications for Affordable and Rental Assisted properties generally take 5 to 7 months to close whereas two-stage applications for market rate properties generally close in 8 to 12 months subject to deal specifics. 


Additional HUD Requirements and Items for consideration

  • An initial operating deficit account may be required to cover operating shortfalls incurred prior to stabilization. Typically the amount will be equal to the greater of an appraiser's or underwriter's estimate, or 4 months of debt service for garden apartments, or 6 months of debt service for elevator buildings.
  • A working capital deposit in the form of cash or a letter of credit is required by HUD on all new construction projects in the amount of 4% of the loan amount. For substantial rehabilitation the deposit would be equal to 2% of the loan amount. 
  • Unused working capital and initial operating deficit escrows are released at the later of 12 months from final endorsement or 6 months of break-even occupancy.
  • Stabilization must be projected as achievable within 18 months of certificate of occupancy. 
  • The borrower must retain a qualified arms-length supervisory architect during the construction.
  • A cost certification for the general contractor and owner are required upon construction completion.
  • The general contract must execute a GMP contract, provide a 100% performance and payment bond (or cash escrow or letter of credit acceptable), and have a liquidity position equal to at least 5% of the project construction contract plus all uncompleted construction work.
  • Loans over $40,000,000 may be subject to more conservative leverage and DSRC requirements.
  • Maximum underwritten occupancy of 93% for market rate properties and 95% for 90% rental assistance properties.
  • Qualifies for Ginnie Mae guaranteed mortgage-backed securities, direct placement or may be used to credit enhance tax-exempt bonds

Get Qualified!

To apply for a 221(d)(4) please go to our Apply Page by clicking this link and follow the instructions or send an email with your contact information and about your project to hello@multifamily.loans today. 

If a HUD 221(d)(4) loan isn't right for your multifamily development or substantial rehabilitation project, please visit www.multifamily.loans for more options that include bank financing, life company financing, Fannie Mae, Freddie Mac and more. You may email Multifamily.loans directly at hello@multifamily.loans

Call Now: (877) 585-8645

Speak With a HUD Insured Multifamily & Healthcare Finance Specialist